New Water Treatment Technology and Treatment Advances from Pure Effect, Inc.
Pure Effect, Inc. sells and rents water treatment system for Boron removal from impacted groundwater. Boron is both naturally occurring and from anthropogenic sources.
Before a construction site can discharge groundwater into the storm drain a NPDES (National Pollutant Discharge Elimination System) Permit must be obtained from the California Regional Water Quality Control Board. Depending on the geographical location of the job site, this process can take 6-12 weeks and can cost as much as $18,000 to complete the application process.